Scope of works
The full PV generator — from unloading to grid integration.
Four coordinated work packages, one team, one responsibility. We tailor the scope to the role split in your EPC contract — from individual packages to the complete PV generator.
MECH
Structure & modules
We deliver
- Unloading and delivery inspection
- Support structure assembly
- PV module installation
- Row and table labelling
Resources on site
- Own pile drivers and telehandlers
- Installation crews with our own foremen
- Weekly progress reporting
DC
DC installation
We deliver
- DC cable routes including termination
- Equipotential bonding and earthing
- Inverter installation with metering system
- RS485 communication between inverters
Quality
- Directly employed, certified electricians
- Measurements and protocols to the investor's specification
- Route and string labelling to project standard
AC / MV
AC & medium voltage
We deliver
- AC cable laying including trenching
- Medium-voltage cabling with labelling
- Transformer station foundations
- Integration with the MV grid
Resources on site
- Own excavators for cable routes
- Transformer foundations built with our own resources
- Coordination with the grid operator via the investor
SITE
Site support
We provide
- Site management on site (EN / DE / PL)
- Own machine park — 9 machines
- Acceptance and as-built documentation
Standard
- One site manager — one point of contact
- Documentation to the investor's standard
- Handover with a complete set of protocols
05 · PROCESS
How a project runs with us
| Stage | What happens | Typical duration |
|---|---|---|
| 01 · Mobilisation | Crew and machines on site, site facilities, H&S documentation, delivery schedule agreed with your site management | 2–4 weeks from contract |
| 02 · Pile driving | Own pile drivers, post setting to project tolerances, daily pile logs | per project schedule |
| 03 · Structure & modules | Support structure assembly, module installation, row and table labelling | 17–20 MWp / month |
| 04 · DC works | Cable routes, termination, earthing, inverters, RS485 — with measurement protocols | parallel to stage 03 |
| 05 · AC / MV | AC cabling incl. trenching, MV works, transformer station foundations | per grid-connection plan |
| 06 · Testing & handover | As-built documentation, protocols to the investor's standard, acceptance support | until signed acceptance |
06 · STANDARD
Included in every package
MANAGEMENT
Site management
- Site manager on site — one point of contact
- EN / DE / PL speaking supervision
- Daily coordination with your site management
REPORTING
Progress reporting
- Weekly progress report with photos
- Quantities installed vs. schedule
- Issues flagged within 24 h
HSE
Safety on site
- Trained foremen, job instructions
- Housekeeping to the investor's standard
- Full posting compliance (A1, wages)
DOCS
Documentation
- Measurement and test protocols
- As-built documentation
- Handover package for acceptance
One contractor for the entire PV generator.
From unloading the first delivery to integration with the medium-voltage grid — one team, one contractual responsibility.
Installation capacity17–20 MWp / month
Framework agreement5–10 MW / month
MarketsDE · NL · PL · EU